USS Galileo :: View News
Previous Next

Bridge Renovation Complete

Posted on 30 Nov 2012 @ 7:53pm by Rear Admiral Lirha Saalm

======================
...INCOMING MESSAGE...
======================

CLEARANCE: Level 1
FROM: CAPT Lirha Saalm
TO: All USS Galileo Personnel

The main bridge refit is complete, and Deck 1 is now open. Please be mindful of engineering and science technicians as they perform final tests on the new module.

All crew are required to familiarize themselves with the new layout and stations. A list of notable changes can be found below.


Galileobridgerefitsmall.jpg


Notable Changes and Upgrades

- Installed new Mark-II Nova-refit module with increased floor space.
- View screen is now holographic to prevent star-field syndrome.
- Ops now occupies the starboard-side alcove.
- Science now occupies the port-side alcove.
- Two additional stations have been installed (Mission Ops II and Auxiliary).
- New holographic Astrometrics Master Systems Display (MSD) has been installed.
- Conference room is now located directly behind the Engineering MSD.
- Escape pod exit leads to four escape pods located aft on Deck 1.


======================
--END MESSAGE--
======================

 

Previous Next

Category: In-Character

labels_subscribe RSS Feed